Banks to establish data center automation configuration management system planning

Page view
[Abstract]:
Banks to establish data center automation configuration management system planning...

Banks to establish data center automation configuration management system planning

Current Problems and Needs of Regional Commercial Banks / Rural Credit Cooperatives in Daily Operation and Maintenance of Data Centers

1, due to business growth and new business on-line increased, the rapid growth of the number of IT equipment. In the configuration management, change management, compliance audit and joint troubleshooting, etc., due to manual operation and maintenance caused a lot of tedious work and error-prone operations have brought great risks to safety

2, the concentration of business and data concentration, making the centralized management of IT operations formed an inevitable trend. However, it is impossible for the staffing to be directly proportional to the increase of the number of equipment. It is the only way to reduce the manual intervention by establishing a standardized, process-based and automated operation and maintenance management platform.

3, with the original network management / system management and other monitoring platform to form a three-dimensional integrated operation platform

4, data center automation configuration management system needs

Ø Coverage: network, servers, databases, middleware (due to the storage system manufacturers own management tools, which can be integrated)

Ø Management Capability 1: Automated configuration information collection and management, the initial formation of the purpose of IT asset management, and to provide a basis for the allocation of change decisions

Ø Management Capability 2: Configure compliance auditing and tracking, monitor non-compliant changes in real time, automate error correction, and track audit of improper changes

Ø Management competence 3: User authority management, making change authority according to multi-dimensional functions such as personnel job responsibilities, level authority, operation and maintenance roles; grouping equipment in multi-dimensional; super-authority equipment is not visible;

Ø Management Capability 4: Automated daily inspection, carrying out automated inspection on daily inspection of equipment, health checkup, starting and stopping of planned equipment, configuration backup (especially network equipment) and recovery verification, etc .;

Ø Management Capability 5: Automated deployment of software / patches, including automatic deployment of network devices, servers, new versions of applications / patches, automatic startup verification and rollback after installation, automated comparison before and after configuration changes,

Ø Management capabilities 6: Cloud platform; With virtualization software (such as VMWARE), cloud architecture platform can be built, for example, developing test cloud platform; Rapid deployment and uninstallation of development test environment

5, the principle of configuration

Ø Network layer: 50 network devices / 1 license, including switches, routers, firewalls, load balancing, etc.

Server layer (including database and business layer): 1 server / 1 license, regardless of the level of the server;

 

According to the performance statistics of China Construction Bank, ICBC, China Merchants Bank, Bank of China and Bank of Communications, the performance evaluation of project revenue quantification is as follows

- Asset statistics reporting time greatly reduced, from the general 3.5 days, reduced to 4 hours

- The correct rate of asset information, up to 100% (including: customized asset information)

- The efficiency of complex O & M operations has been greatly enhanced, requiring 2.5 weeks for 5-7 people and 2-4 days for 2-4 people (greatly reduced time and number of people - for example, the online banking system is online and changed)

- The accuracy of complex operation and maintenance operation is increased to 100% (no loss of operation or no additional operation steps - for example, the online banking system is online and changed)

- Significantly increased average concurrent concurrent workloads by 5-10X (complex, repetitive productivity improvements - for example, system and application patch distribution)

- The comprehensiveness and coverage of O & M operation audits increased by 15% -45% (to reduce audit loopholes and improve continuously, such as compliance check, health check and configuration comparison)